Fuquay-Varina Arts Center

Construction is underway on the Fuquay-Varina Arts Center, located at 121 East Vance Street in downtown Fuquay. Intended for use as a community arts center and theatre, the building will be 18,000 square feet and will host shows and events as well as classes.

Southern Street Paving

Southern Street is now paved, in anticipation of the impact of the closing of the railroad crossing at Lawrence Street. This provides connectivity between Lawrence Street and Bridge Street via a one-way street.

Bridge Street Sidewalk

The Bridge Street sidewalk project is complete, and includes the construction of 0.4 miles of sidewalk along Bridge Street. The sidewalk will fill in existing gaps along Bridge Street and cross over the railroad. The project will continue along Bridge Street and will be terminated at Lincoln Heights Elementary School with a high visibility crosswalk at the Conover Street intersection. 

Academy Street Sidewalk

This project improves connectivity along West Academy Street (Hwy 42). The sidewalk spans from the intersection with Judd Parkway SW to the existing sidewalk in the vicinity of Summerdale Subdivision, providing a direct route from downtown Fuquay to Fleming Loop Park. It is located on the south side of Academy Street, and is now completed. 

Non-Residential Site Plan Project

Aldi Expansion

Construction is nearly complete for an expansion at Aldi, located at 1375 North Main Street (Hwy 401). The expansion includes an addition of 3,400 square feet to the rear of the building, as well as improvements to the parking lot.

Attain Street Office Building

A site plan is under review for offices at 400 and 404 Attain Street. The plan includes two office buildings totaling 30,000 square feet and an accompanying parking lot with access from Procure Street and Attain Street. The proposed buildings are on a 1.84 acre lot. 

Bengal Towne Centre      

Plans are under review for an 18.48 acre form-based development called Bengal Towne Centre, located at 1000 NE Judd Parkway near the intersection with Stewart Street. The plan includes 13 tracts, to be developed in the future for a variety of uses including office, commercial, mixed-use, apartments, townhomes and civic space.

Destination Community Church of God

A site plan has been approved for Destination Community Church of God, to be located at the corner of Holland Road and SE Judd Parkway. The proposed 12,000 square foot building is on a 2.63-acre lot. 

Fuquay-Varina Branch Library

Plans are under review for a new location of the Wake County Public Library. The plan includes a 3,000-square foot building, an entrance plaza, and a parking lot. The new library will be located on a 6.36 acre parcel on Bramblehill Drive and East Academy Street. 

Harris Teeter Fuel Center

Harris Teeter Fuel Center at 8112 Fayetteville Road (Hwy 401) is now open. This project is located near the Pep Boys and Splash Express Car Wash and includes 14 gas pumps.

Lincoln Heights Elementary School

Construction is currently underway at Lincoln Heights Elementary School. Construction includes new buildings, renovations to existing buildings, and parking areas at the existing school site. Lincoln Heights Elementary School is located at 307 Bridge Street.

McCormick​ Medical Office

Construction is underway on a medical office facility called McCormick Medical Office, located at 401 Attain Street. The plan features an 11,250-square foot medical office building.

National Tire & Battery

Construction is underway for National Tire & Battery, located at 939 East Broad Street, in the Walmart Shopping Center. The plan features a 6,900 square foot building.

Partin Place Amenity Center

Plans have been approved for an amenity center located in Phase 3 of Partin Place Subdivision, located off of NC Hwy 42. The proposed amenity center includes a pool, pool house, and mailbox kiosk.

State Employees Credit Union

A site plan has been approved for a new location of the State Employees Credit Union at 9900 Fayetteville Road (Hwy 401) near the Banks Road intersection. The building is 10,000 square feet.

The Learning Experience

A site plan has been approved for the Learning Experience, a daycare located at 2020 Marquee Lane, in Marquee Station. The proposed building is 10,000 square feet.

Willow Spring High School

Construction is underway for the newest addition to the Wake County Public School System. Willow Spring High School is located at 1704 Old Honeycutt Road, at the corner of Kennebec Road and Old Honeycutt Road. Willow Spring High School is expected to open in 2019.

Residential Development Projects

Adalyn Place

Construction plans are under review for Adalyn Place Subdivision. This project will be located on a 30.075 acre property at the intersection of East Academy Street and SE Judd Parkway. Adalyn Place is an open space development, including 92 residential lots averaging 7,400 square feet in size. The plan calls for 7.425 acres of open space and the extension of both East Academy Street and Bevis Marks Drive.

Arlington Meadows

A subdivision plan is under review for Angier Road Subdivision, to be located at 1401 Angier Road. The plan calls for a total of 175 residential lots with an average size of 8,324 square feet. The subdivision will include 18.23 acres of open space.

Avalon Springs

Construction of homes is almost completed in Phase 2 of Avalon Springs. There are 14 residential lots total in this phase.

Avery Crossing

Construction plans have been approved for Avery Crossing Subdivision located at 1301 Phelps West Road. This will be an open space development featuring 56 single-family residential lots with an average size of 7,120 square feet. The plan proposes 4.265 acres of open space within the overall 19.393 acre project area.

Basal Creek Planned Unit Development

A master plan has been approved for a Planned Unit Development, to be located at 508 Schnapps Lane, called Basal Creek Planned Unit Development. The plan includes an 85.8 acre tract, to be developed in the future for a variety of uses including office, commercial, mixed-use, apartments, and townhomes. The plan also calls for just over 30 acres of open space.

Bent Tree Phase 1

Construction plans have been submitted for Bent Tree Phase 1, located at 721 and 911 Fleming Loop Road. The open space development features 78 single-family residential lots in Phase 1, with an average size of 8,500 square feet, on the overall 34 acre project area.

Bent Tree Phases 2 & 3

A preliminary subdivision plan has been approved for Bent Tree Phases 2 & 3, located at 721 and 911 Fleming Loop Road. The open space development features 205 single-family residential lots in Phases 2 &3, with an average lot size of 8130 square feet. The plan also calls for just over 24 acres of open space.

Bentwinds Bluffs

Construction of homes is now underway in the Bentwinds Bluffs Subdivision, located off of Old Mills Road. This is a conventional subdivision of 69 lots on 30.56 acres, which will feature 10,000 square foot minimum lot size.

Black Creek Estates

Construction plans are in review for Black Creek Estates, located at 1955 Eddie Howard Road. The 26-acre tract includes 24 single-family residential lots, with an average 27,450 square foot lot size.

Brighton Ridge

Construction plans are in review for Brighton Ridge Subdivision, located near the intersection of Hilltop Needmore Road and Lake Wheeler Road. The open space development includes 164 lots, averaging 10,300 square feet in size.

Broadwell Trace

A preliminary plan is in review for an open space development called Broadwell Trace, to be located at 721 Coley Farm Road. The plan features 120 single-family residential lots with an average lot size of 6,721 square feet, and 16.9 acres of open space.

Brookside

The construction of homes is nearly complete for Phases 3A and 3B of Brookside, a subdivision near the intersection of NE Judd Parkway and Stewart Street, and located off of Judd Parkway. Brookside is an open space development, with 8.4 acres of open space within a total of 31.6 acres, containing 96 single-family lots.

Cedar Crest  

Homes are under construction at Cedar Crest Subdivision, located at 6826 Sunset Lake Road, just north of Ballentine Elementary School. Cedar Crest is a conventional subdivision featuring 59 total lots with minimum lot sizes of 10,000 square feet, on 22.15 acres.

Copper Pond

Homes are under construction in Phases 1 and 2 of Copper Pond Subdivision. Construction plans for Phases 3-5 have been approved for the Copper Pond Subdivision, located off Piney Grove Wilbon Road near the intersection with West Academy Street (Hwy 42). Copper Pond features 50 total lots in 5 phases with a minimum lot size of 20,000 square feet. The overall development includes 46.61 total acres.

Crown Village

A preliminary subdivision plan has been approved for a conventional subdivision called Crown Village, located at 6513 Mims Road. The subdivision features 10 lots, averaging 36,200 square feet in size.

Cypress Meadows

Construction of homes is nearly complete in Cypress Meadows Subdivision, an open space development to be located off Ten-Ten Road and Old McCullers Road. The site is 53.5 acres in total, and includes 152 lots and 18.58 acres of open space.  

Pine Field

A preliminary subdivision plan is in review for a conventional single-family residential subdivision at 2525 Fleming Road, called Pine Field. The preliminary plan calls for 13 residential lots with a minimum lot size of 20,000 square feet. 

Gray’s Creek

Construction of homes is nearly complete in Gray’s Creek Subdivision, an open space development located off of Wilbon Road. The total subdivision includes 250 lots on over 90 acres, and will have access onto Coley Farm Road and Wilbon Road. 

Hidden Valley

Construction plans are in review for Hidden Valley Subdivision, located across multiple parcels that stretch between Purfoy Road and South NC 55 Highway, previously the Hidden Valley Golf Club. The 214.96 acre open space development will feature 505 single-family lots, averaging 9,400 square feet in size.

Holland Station Townhomes

Plans have been approved for Holland Station Townhomes, located at 560 SE Judd Parkway. This project includes 110 units on 21 acres, has access onto Holland Road, and includes the extension of Barneswyck Drive.

Judd Reserve

Construction is complete at Judd Reserve, a conventional subdivision located at 7209 Kennebec Road. Judd Reserve features a total of 52 lots with a minimum lot size of 20,000 square feet.

Kennebec Meadows

Construction plans are in review for Kennebec Meadows, located at 6817 Kennebec Road. The development totals 48.27 acres and includes 49 single-family lots. Lot sizes will average 27,000 square feet.

The Village at Lake Wheeler (formerly Lake Wheeler)

A preliminary plan is in review for an open space development located at 8536 Lake Wheeler Road, called the Village at Lake Wheeler. The plan calls for 108 single-family residential lots, with an average lot size of 8,700 square feet. The development will feature a total of 13.1 acres of open space.

Logan Meadow

A preliminary plan has been approved for a conventional subdivision, located at 501 SE Judd Parkway, near the intersection of Holland Road. Logan Meadow totals 4.64 acres and includes 12 single-family lots. The lots will average 7,400 square feet in size.

Meadowbrook

Construction plans are in review for Meadowbrook Subdivision. This is an open space development totaling 144.82 acres, located at 6600 South NC Highway 55. The plan calls for 282 single-family residential lots with an average lot size of 13,285 square feet. A total of 45.12 acres of open space is included. 

Meridian at Broad Street Market

Construction of Meridian at Broad Street Market, a multifamily residential development, is underway. This project is located at 1810 James Slaughter Road behind Broad Street Market and has access onto NE Judd Parkway . The development features 216 total apartment units and a 7,453 square foot clubhouse building with an outdoor pool.

Mill Ridge South

Construction of homes is complete in Mill Ridge South, a residential subdivision with 47 total lots located off of James Slaughter Road.

Meyers Place

Construction plans have been approved for a single-family conventional subdivision located at 6308 Mims Road, called Meyers Place. This 56.39 acre development features 39 single-family lots averaging 35,400 square feet in size.

Oaks of Sippihaw

The construction of homes in Phase 4 of Oaks of Sippihaw, which includes 25 lots, is nearly complete. This phase is accessed from Phase 3 of Oaks of Sippihaw, and provides connections to two (2) other locations in the Woodchase Subdivision.  The Oaks at Sippihaw subdivision features 145 total lots.

Partin Place

Construction of homes is complete in Phases 1 and 2 of Partin Place Subdivision.  Infrastructure for Phases 3 and 5 is under construction. Construction plans for Phases 4 and 6 are in review. The subdivision features a total of 289 residential lots. Phases 1 and 2 can be accessed via Harrison Place Lane, in the existing Harrison Place Subdivision off of NC Hwy 42.

Patriot Bluffs

Construction plans are in review for a residential development located at 6428 Johnson Pond Road, called Patriot Bluffs. The open space development features 52 single-family lots, with a minimum lot size of 5,000 square feet.   

Powell Place

A preliminary subdivision plan is in review for Powell Place, located at 5404 Old Powell Road. The open space development features 60 single-family residential lots, with an average lot size of 8,790. The plan also includes 17 acres of open space.

The Retreat at Fuquay-Varina

A site plan is under review for The Retreat at Fuquay-Varina, a multi-family development located at 800 NE Judd Parkway across from Products Road. The project features 432 units.

Ryan Place

Construction plans are in review for Ryan Place, located at 1335 Bowling Road. This open space development includes 63 single-family lots, averaging 7,600 square feet. 

Sonoma Springs

Sonoma Springs is a 46-acre open space development located off of Hilltop Needmore Road near the intersection with Sunset Lake Road. The subdivision will be constructed in three (3) phases, featuring a total of 126 single-family residential lots with a minimum lot size of 6,000 square feet. Construction of homes is complete in Phases 1 and 2 of Sonoma Springs. Construction plans for Phase 3 of Sonoma Springs have been approved.

South Lakes

South Lakes is a Planned Unit Development (PUD) that features 991 residential lots. Multiple phases are now in progress. Home construction is underway in Phase SF-7. This phase includes 290 lots in total, divided into 6 smaller sections, and will be accessed from Old Honeycutt Road. Phase SF-8, an infrastructure only project, has been approved. Phase SF-10 construction plans have been approved. This phase proposes 75 single-family lots located on the east side of Kennebec Road. Home construction is nearly complete in South Lakes Phase SF-11. This phase is adjacent to Phase SF-4 and includes 45 single-family lots.  

Summerdale

Summerdale is an open space subdivision accessed off West Academy Street (NC Hwy 42) and Coley Farm Road. The subdivision features 201 single family lots with an average lot size of 5,300 square feet. Construction of homes is nearly complete in Phases 5 and 6. Phase 7 construction plans are in review.

Summerdale North

Construction plans are in review for Summerdale North, located on Dawley Drive. The open space development features 26 lots on 6.7 acres, with an average lot size of 6,100 square feet.

Sunset Bluffs

A subdivision plan has been approved for a development of 65.7 acres, located off of Herbert Akins Road near the intersection with Bass Lake Road. The development features 185 lots and 17.62 acres of open space in Phases 1 through 5. Construction of homes is now underway in Phases 4B, 4C, 5A, and 5B.

Plans have been approved for Sunset Bluffs Phases 6-17. This is an open space development featuring 214 total lots with a minimum lot size of 7,000 square feet. Construction of homes has begun in Phase 6. Construction of infrastructure is underway for Phases 7, 8, and 10. Construction plans for Phases 13 and 14 have been approved.

Sunset Glen

Construction of homes is underway at Sunset Glen, a conventional subdivision featuring 46 total lots, located off of Sunset Lake Road. The subdivision includes a minimum lot size of 20,000 square feet.

The Spring Townhomes

Construction is underway for a 15-unit townhome development to be located in downtown Fuquay on the corner of Spring Avenue and Vance Street, at 208 Spring Street.

Theys Mill

A preliminary subdivision plan is in review for a single-family subdivision, located at 1240 Kenneth Branch Drive, called Theys Mill. This open space development includes 76 lots averaging 6,300 square feet in size. The project has access onto Bowling Road.

Trilogy Farms

A preliminary plan is in review for a 65-acre subdivision development, located at 8220 Lake Wheeler Road, called Trilogy Farms. The open space development includes 121 single-family lots averaging 13,900 square feet in size.

Union Station

Construction plans are in review for a single-family home subdivision, located at 235 Coley Farm Road called Union Station. This open space development includes 66 lots averaging 7,900 square feet in size.

White Oak II

Construction of homes is underway at White Oak II Subdivision. The conventional subdivision includes six (6) new single-family residential lots with a minimum 30,000 square feet in size. The project is located at 6801 Dwight Rowland Road.

New Businesses & Existing Business Improvements

This is a list of renovations and improvements to existing buildings for new businesses coming to Fuquay-Varina, as well as existing businesses making improvements or expansions.

Aviator Pizza & Retail

Plans are in review for an expansion of the existing Aviator Brewing Company Beer Shop located at 601 East Broad Street. The expansion incorporates another existing building, at 603 East Broad Street, and includes a pizzeria, retail store, and parking lot.

Bazzel Creek Church Expansion

Plans are in review for an expansion of the Bazzel Creek Church located at 1228 Wilbon Road. This expansion includes a 3,000-square foot addition and parking lot

Bob Barker Building Addition

Construction is underway for an addition to the Bob Barker facility located at 7925 Purfoy Road. This expansion includes a 44,300 square foot building addition to the facility, and a parking lot expansion.  

McDonald’s Site Improvements

McDonald’s, located at 1409 North Main Street (Hwy 401), has submitted a site plan and building plans for the existing location. The improvements will provide for upgraded parking and accessibility.

Southbend Expansion

Expansion of Southbend, located at 1100 Old Honeycutt Road is underway. The projects includes a 45,000 square foot expansion to the rear of the existing building.

Southview Self-Storage Expansion

A site plan has been submitted and is under review for an expansion of the Southview Self Storage Facility, located at 6008 NC Highway 55.

Taylor Family Dentistry

Construction has begun on a 1,700-square foot expansion of the Taylor Family Dentistry. The office is located in King’s Grant Commons at 8105 Fayetteville Road.

Wake Chapel Christian Church

Construction is underway for the expansion of Wake Chapel Christian Church, located at 905 Wake Chapel Road. The plans include demolition of the existing parsonage building and relocation of the playground. The existing main building will be enlarged by 7,726 square feet.