Stormwater Management

NPDES Phase II Stormwater Program

The North Carolina Division of Water Quality issued the Town of Fuquay-Varina a National Pollutant Discharge Elimination System Phase II Stormwater Permit on November 11, 2011. The Town's Stormwater Program is designed to meet the requirements of the 6 minimum measures outlined within the federally mandated NPDES Phase II stormwater permit.

Minimum Measures

Minimum Measures Required by NPDES Phase II Stormwater Permit:

Picture2

Useful Documents